National Highway Authority Of India's All Tenders | Results : 278 Records Found
Tenders
No.Tender ID & Tender BriefStateTender ValueDue Date
1 TR 6401573 Widening and Strengthening of Uncha nagla- Khanuawa- Roppas- Dholpur Section of NH-12 to 2 lane with paved Shoulders under NHDP Phase-IV in the State of Rajasthan / Uttar Pradesh on EPC mode. NEW DELHIRefer Document02/12/2014
2 TR 6252264 Improvement/Augmentation of Four Laning of Km 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km 5.000 to Km 81.000] and Two Laning with Paved Shoulders from km 79.340 to Km 118.795 (Existing Chainage) [Design Chainage Km 81.000 to Km 120.000] of Madurai- Ramanathapuram Section of NH-49 [Total Design Length 115.000 Km] in the State of Tamil Nadu on EPC mode under NHDP-III. TAMIL NADU7,34,55,00,000.0028/10/2014
3 TR 6227797 Improvement, Augmentation of Four Laning From Km 5.000 To Km. 79.340 (Existing Chainage) [Design Chainage Km 5.000 To Km 81.000] And Two Laning With Paved Shoulders From Km 79.340 To Km 118.795 (Existing Chainage) [Design Chainage Km 81.000 To Km 120.000] Of Madurai- Ramanathapuram Section Of Nh-49 [Total Design Length 115.000 Km] In The State Of Tamilnadu On Epc Mode Under Nhdp Phase-III. NEW DELHIRefer Document28/10/2014
4 TR 6210129 Improvement/Augmentation Of 2 Laning With Paved Shoulders From Km 94.000 To Km 174.000 (Design Chainage From Km 94.000 To Km 174.000) Of Karaikudi Ramanathapuram Section Of Nh-210 Including 500 M On Sh 35 - Madurai Road (Near Devakottai Rasta Railway Station) In The State Of Tamil Nadu On Epc Mode [Total Design Length = 80.000 Km] Under Nhdp-Iii . TAMIL NADURefer Document17/10/2014
5 TR 6212713 Four Laning of Ramban to Banihal Section of NH-1A (Now NH-44), From Km 151.000 To Km 187.00 On EPC mode in the State of Jammu & Kashmir under NHDP Phase II. JAMMU AND KASHMIR12,38,68,00,000.0017/10/2014
6 TR 6212715 Four Laning of Udhampur to Ramban section of NH-1A (Now NH-44) from Km. 67.00 to Km. 89.00 & Km. 130.00 to Km. 151.00 on EPC mode in the state of J&K Under NHDP-Phase-II. JAMMU AND KASHMIR13,31,66,00,000.0017/10/2014
7 TR 6380691 Consultancy Services for Authority’s Engineer for Supervision of a) Improvement & Augmentation of Thanjavur - Pudukottai section of NH-226 to 2 laning with Paved Shoulders from Km 0.000 to Km 55.228 Existing Chainage from Km 0.000 to Km 56.460) (Total Design Length 55.228 Km) and b) Improvements & Augmentation of Tirumayam - Manamadurai section of NH-226 to 2 laning with Paved Shoulders from km 77.200 to km 154.929 (existing Chainage km 149.800) Total Design Length 77.729 km) on Engineering Procurement and Construction (EPC) Mode under NHDP Phase-IV in the State of Tamil Nadu. TAMIL NADURefer Document30/09/2014
8 TR 6380695 Consultancy services for Authority’s Engineer for Supervision of Improvement & Augmentation of Karaikudi - Ramanathapuram section to 2 laning with Paved Shoulders from Km 94.000 to Km 174.000 (Existing Chainage from Km 94.000 to Km 174.000 of NH 210 including 500 m on SH 35 – Madurai Road (near Devakottai Rasta Railway Station) (Total Design Length 80.000 Km) on Engineering Procurement and Construction (EPC) Mode under NHDP Phase-III in the State of Tamil Nadu. TAMIL NADURefer Document30/09/2014
9 TR 6387627 Consultancy services for Authority’s Engineer for Supervision of Improvement & Augmentation of Karaikudi - Ramanathapuram section to 2 laning with Paved Shoulders from Km 94.000 to Km 174.000 (Existing Chainage from Km 94.000 to Km 174.000 of NH 210 including 500 m on SH 35 – Madurai Road (near Devakottai Rasta Railway Station) (Total Design Length 80.000 Km) on Engineering Procurement and Construction (EPC) Mode under NHDP Phase-III in the State of Tamil Nadu. TAMIL NADU2,89,73,00,000.0030/09/2014
10 TR 6387633 Consultancy services for Authority’s Engineer for Supervision of Improvement & Augmentation of 4 Laning of Km 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km 5.000 to Km 81.000] and 2 Laning with Paved Shoulders from km 79.340 to Km 118.795 (Existing Chainage) [Design Chainage Km 81.000 to Km 120.000] of Madurai- Ramanathapuram Section of NH-49 [Total Design Length 115.000 Km] in the State of Tamil Nadu on EPC mode under NHDP-III. TAMIL NADU7,34,55,00,000.0030/09/2014
11 TR 6401580 Widening and Strengthening of Phalodi - Jaisalmer Section of NH-15 to Two/Four lane with Paved Shoulder from Km 163.400 to Km 323.857 (Length 160.457 Km.) under NHDP- IV in the state of Rajasthan on EPC mode. MULTI STATE5,67,61,00,000.0030/09/2014
12 TR 6400728 Ordinary repairs and special repairs to reach from km 299.000 to km 419.000 of hospet to chitradurga section. KARNATAKARefer Document30/09/2014
13 TR 6401567 Institution of Valuers for Survey and valuation of affected structures for - Solan to Shimla Section of NH- 22 (new NH-5) from Km. 106.00 to 156.507 in the state of Himachal Pradesh HARYANA13,70,000.0029/09/2014
14 TR 6405839 Appointment of Technical Consultant for Preparation of Feasibility Report for 4-laning of Palwal-Sohna-Rewari Section of National Highway No.71B (Old) in the State of Haryana through Engineering, Procurement and Constructions (EPC) basis. HARYANA8,00,00,00,000.0029/09/2014
15 TR 6405856 Design, Construction, Development, Finance operation and Maintenance of Km. 596.750 to Km. 653.225 on NH No. 7 in the State of M.P. BOT (Annuity) Basis under NHDP-Phase-II during Operation & Maintenance Period for 36 Months-Consultancy Package NS-I/IC/MP-3. MULTI STATE4,07,60,00,000.0029/09/2014
16 TR 6405789 Independent Consultancy Services during O & M Period for 4/6 laning of End of Durg bypass– Chhattisgarh/Maharashtra border (Km. 322.4 – Km. 405) of NH-6 under NHDP Phase-IIIA in the State of Chhattisgarh. CHHATTISGARHRefer Document29/09/2014
17 TR 6401565 Improvement & Routine Maintenance from km 29.300 to km 86.000 (Kundli Border to Panipat section) of NH-1 in the State of Haryana.. NEW DELHI35,47,00,000.0026/09/2014
18 TR 6318611 Construction of Flyover at Derabassi from Km. 29.830 to Km. 30.970 of NH- 22 (Ambala- Chandigarh Section) on EPC mode HARYANA88,51,00,000.0026/09/2014
19 TR 6400521 Improvement and routine maintenance of kundli border – panipat section from km 29.300 to km 86.00 of NH-1. HARYANARefer Document26/09/2014
20 TR 6339757 (i) Development of Six-Lane Eastern Peripheral Expressway (NH No. NE—II) in the states of Haryana and Uttar Pradesh-Packaged from km 00 to km 46 (ii) Development of Six-Lane Eastern Peripheral Expressway (NH No. NE—II) in the state of Uttar Pradesh-Package-II from km 46 to km 90 (iii) - Development of Six-Lane Eastern Peripheral Expressway (NH No. NE—II) in the states of Haryana and Uttar Pradesh - Package-Ill from km d 90 to km 135, on EPC mode. MULTI STATERefer Document23/09/2014
Show Page: 12345678910...  (Total Records: 278)Records Per Page: